- Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of BG line between Barwadih-Chirimiri (Ambikapur) (182 Km)
- Conducting Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of New BG line between Sardega-Gare Pelma (30km).
- Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of New BG line between Sardega-Lajkura (50km).
- Conducting Final Location Survey, including collection of field details for geotechnical investigation, preparation of GADs & other drawings and preparation of survey report & estimate etc for the work of New BG line between Sardega-Pathalgaon (128km)
- Final Location Survey between Swamihalli-Rayadurg Stations (52.0 Kms)
- Carrying out Final Location Survey, Geotechnical Studies, Preparation of LOP for Engineering / Electrical/ S&T Works, ESP and L-Section, General Arrangement Drawings of bridges/ RUB/ ROB, Preparation of Detailed Project Report (DPR) & EPC Tender Document and other Preliminary Activities for preparing Detailed Estimate on actual realistic Cost in connection with Sirmutra- Gangapur City (75.68 Km) new Line Project
- Final location survey (FLS) for "Alternate Feeder route from Chopan/Singrauli area to DFC (100 Km).
- Conducting Final Location Survey, soil exploration and preparation of GAD for for ROBs/RUBs/Minor Bridges, yard plans between Tumkuru Davanagere stations (199.7 Kms).
- SCR Construction Organization- Nanded division- Akola-Khandwa section- Gauge conversion of track from MG to BG between Akot-Amlakhurd section (Phase-III)-Carrying out Survey, Design and Geotechnical Investigations for the proposed tunnel (6.65 km long) between USARNI and JAMOD (new stations) and on the diversion alignment (73.917 km) including preparation of Detailed Project Report, plans, drawings, land proposals and other relevant documents between Tukaithad-Adgaon Buzurg stations (80.567 km).
- Final Location Survey (FLS) for the New line from Baramulla to Uri (50 Km ) J&K :
- Final Location Survey (FLS) for New line between Anantnag- Bijbehara- Pahalgam (77.5 km) J&K.
- Final Location Survey (FLS) for New line between Sopore-Kupwara (33.70 km) J&K
- Appointment of Authority Engineer for providing Project Management Services for the Major Upgradation of Kota Railway Station of West Central Railway
- Project Management Services for Major upgradation of Jaipur Railway Station of Jaipur Division of North Western Railway.
- Preparation of Feasibility Survey & Detailed Project Report by conducting Preliminary and detailed survey including preparation of detailed plans, design &drawings and sections, conducting geotechnical investigation, preparing construction drawings, detailed estimate, marking final alignment with traverse points & TBM etc. & preparation of Tender document for execution work in respect of Civil engineering, S&T and OHE in connection with proposed Railway siding of Sanghamitra OCP of Central Coalfields Limited.
- Preparation of Detailed Project Report by conducting Preliminary and detailed survey including preparation of detailed plans, design & drawings and sections, conducting geotechnical investigation, preparing construction drawings, detailed estimate, marking final alignment with traverse points & TBM etc. & preparation of Tender document for execution work in respect of civil engineering, Electrical( General & OHE) and Signaling for rail connection from Dadri Junction Station of DFCCIL to the proposed Freight Village at Dadri, Greater Noida under Delhi- Mumbai Industrial Corridor (DMIC) Project’
- Appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Services (PSS) for “Kottavalasa-Koraput Doubling Project – Execution of Earth-work in formation, blanketing, Minor bridges, drains, Protection works and other allied works and construction of Major bridge No.121 (2x18.30m+1x30.50m C.G), No. 136(2x12.20 m +1x30.50m C.G) from Km. 33.254 – Boddavara Station (including) - to Km. 45.483- Sivalingapuram Station (Including) in connection with Kottavalasa - Koraput Doubling Project of Waltair Division, East Coast Railway excluding Tunnels and approaches (Work-I). & Kottavalasa-Koraput Doubling Project : Execution of Earth-work in formation, blanketing, Minor bridges, drains, Protection works and other allied works and Construction of Major Bridge No.287 (2x12.20+1x18.30 CG) from Km. 72.550 - Borraguhalu Station (including) to Km. 82.750- Karakavalasa Station (Including) in connection with Kottavalasa - Koraput Doubling Project of Waltair Division, East Coast Railway excluding Tunnels and approaches (Work-II)
- Comprehensive Geological Survey Using Modern Technologies for Geological Characterization and Genesis of Strata in Tunnel & Bridge Alignment Locations for New Railway Line Projects, Including Obtaining Environmental, Forest Clearances & Design of Approach Roads to The Major Work Sites Along the Alignment for the Projects under the jurisdiction South Eastern Railway Construction Organization: - 1. New Railway Line for Connecting Unconnected Major Iron Ore Mines in SUNDARGARH & KEONJHAR DISTRICTS of ODISHA State. 2. New Railway Line Between BURAMARA AND CHAKULIA. 3. New Railway Line Between GOURUMAHISANI AND BANGRIPOSI. 4. New Railway Line Between BADAMPAHAR AND KEONJHAR. 5. Any other location under the jurisdiction CAO/C/SER as per the requirement.
- Authority Engineer for providing Project Management Services for “Construction of electrified 4th railway BG line in between (1) Dadhapara-Belaha-Dagori-Nipania-Bhatapara & Hathbandh stations & (2) Rajnandgaon-Dongargarh and Bhilai-Durg Link Block Station (Exc. Yard) in the State of Chhattisgarh in South East Central Railway on EPC Basic’
- Authority Engineer for providing project management services for Major up-gradation of Bilaspur Railway Station of SECR on Engineering, Procurement and Construction (EPC) mode.
- Preparation of Feasibility Study Report for extension of Bangalore Metro Rail Corridors for a length of 68.00 km (approx.) in one corridor viz. Kalena Agrahara (Gottigere) – Jigani – Anekal – Attibele – Sarjapura – Varthur – Kadugodi Tree Park.-Pakage-2





